Plumbing, HVAC, Electrical rough-ins complete and called for inspection

Griffith front porch concrete Griffith front porch final concrete 

Garage slab and front porch slab are poured and finished.  Getting the inspections on the framing, plumbing, HVAC, and electrical on Monday.  The cold has held up from having the inspection done earlier this week because water has to be put on the plumbing lines to test them.  Water and 10 degree temps don’t go well together… Insulation is on standby.