I met with my plan designer and will be getting the preliminary set soon with final plans to follow for the Studio for Linda and Jim. Once I have the final plans I will submit for the clearing permit. I received the results of the soil evaluation. The report shows a low shrink-swell finding for the soils. This is the best result available and is the least costly for the footing for construction.