Posted on

Griffith job basement dig

We have completed the basement dig and will be getting the french drain installed around the perimeter.  The Superior Walls have been signed off on and have been released in to production.  Here are a few pics of the equipment doing the dig… job well done!

digging1  digging3  digging2  digging4

Posted on

Griffith Building Permit is posted on the job

Griffith bldg permit1  

The building permit has been approved and I have posted it on our “builder job site sign”.  We have been given the go ahead to start digging the basement footings for the Superior Wall System.  The weather is looking good for the next several weeks for the basement excavation and prep work.

Posted on

Griffith lot cleared and ready for inspection

Griffith final clearing Griffith basement dig stakes                                                      bldr sign

Signs (builder sign and 4 RPA signs which stands for Resource Protection Act) and permit are posted, silt fence is in place, lot is looking great!  Upon approval of clearing, basement dig will begin tomorrow.  I have already gotten the survey stakes of the house corners placed in preparation for the dig.